CorrectDeck CX® Composite Decking & Railing Systems

CorrectDeck® Composite Decking & Railing Systems
 

 
 

Professionals Login

 

  HOME  | SITE SEARCH  |  FAQS  |  WORLDWIDE CorrectDeck Worldwide

Request a Product Brochure!

Email to a Friend

Installing 4x4 Post - Traditional Mount (Before Decking Installation)

Determine preferred location of the rail post. Remember, CorrectDeck RapidRail is designed for a maximum span of 8' on center.

1. Lower each 4 x 4 post 71/2" into the outer rim joist frame.

2. Through the joist and post, pre-drill two offset 1/2" diameter holes 1" from the left and right edge of the post, approximately 41/2" apart vertically and no closer than 21/2" from the bottom of the post.

3. Install post using 1/2" x 8" carriage bolts and washers (not included). Box frame around the post.

 
 
 

Product Information

Decking

Railing Systems

Docks & Marinas

CorrectDeck DCL

Decking Accessories

Care & Cleaning

Colors & Texture

Product Warranty

Product FAQ's

Photos & Videos

Installation & Care

Decking Installation

RapidRail Installation

Care & Cleaning

Sizes & Specifications

 

for Professionals

Distributor Login

Marketing Material

Technical Information

Sizes & Specifications

Company

Tradeshows & Events

In the News

Podcasts

Worldwide

Contact Us

CorrectDeck® Limited Lifetime Warranty

© 2009 GAF Decking Systems, LLC. All rights reserved.